Skip Ribbon Commands
Skip to main content
Sign In
Hoover HS Green Construction Program Building

The Hoover HS Green Construction Program is a cutting-edge project at Hoover High School that features a modern, commercial woodshop set in an industrial arts classroom. The 5,700-square-foot facility is a true model of green construction. The facility itself serves as an educational lab, teaching students about renewable technologies in construction, including photovoltaic solar systems, renewable and recycled building products, and energy efficiency. A state-of-the-art ventilation system addresses dust and noise, while simultaneously supplying superior air quality in a shop environment. The design of both the educational program and the facility is expected to garner considerable attention across the state and the country. Additional building features include:

  • State-of-the-art ventilation system addressing dust and noise control in the facility 
  • Leadership in Energy and Environmental Design (LEED)-certified
  • Photovoltaic solar system
  • 960-square-foot classroom
  • Explosion-proof fixtures and components of fire alarm, intrusion, lighting and power systems
  • Shade structure
  • Courtyard lined with pervious pavers
    Drought-tolerant landscape
  • Dust collection system with explosion prevention system
  • Storm drain and water filtration boxes

 Project Photos

Get Microsoft Silverlight

 Project Information

Contact:

Facilities Planning & Construction Division
Email: SDUSDFacilitiesInfo@sandi.net
Phone:  858-637-3604
https://www.sandiegounified.org/contact-us-facilities-planning-construction​​