Skip Ribbon Commands
Skip to main content

Albert Einstein Charter ES

:

Albert Einstein AC ES WSM Phs1_GMP1 CZ21-077-24.A1

The Project consists of Make-Ready
Improvements preparing the site to facilitate the construction of Building D, a one-story mixed-occupancy structure housing Kindergarten Classrooms and a Multi-Purpose room, along with related Site and Building Improvements. PWCR#
   ​Albert Einstein Academies Charter ES                        PSA Specialist:
   3035 Ash Street, San Diego, CA 92101                      Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        04/26/22
        Tuesday       08/16/22                                                        Bid award:   07/26/22
        Wednesday  10/19/22
        Thursday     11/16/23                                                         Project value: $17,994,003.33
        Thursday     02/29/24​​

  
  
  
  
collapse Document Types : _PJM Recording, Chat/Q&A, Minutes, Attendee List ‎(13)
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_ Attendees.docx
  
11/17/2023 1:06 PMCruz Maria
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat Log.txt
  
11/17/2023 1:06 PMCruz Maria
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
11/22/2023 2:13 AMCruz Maria
2022-10-19 PJM 2_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat.txt
  
11/17/2023 1:05 PMCruz Maria
2022-10-19 PJM 2_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
11/22/2023 2:11 AMCruz Maria
2023-11-17 PJM 3_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat (2).txt
  
11/17/2023 1:03 PMCruz Maria
2023-11-17 PJM 3_Albert Einstein Charter ES WSM Phase 1 GMP-1_Meeting Minutes.docx
  
11/22/2023 12:57 AMCruz Maria
2023-11-17PJCM III for Albert Einstein ES WSM LLBErickson-Hall P1 GMP 1CZ21-0777-24.A1_Chat.txt
  
2/7/2025 3:25 PMCruz Maria
2023-11-17PJCM III for Albert Einstein ES WSM LLBErickson-Hall P1 GMP 1CZ21-0777-24.A1_Recording.mp4
  
2/7/2025 3:25 PMCruz Maria
2024-02-28 PJM Albert Einstein Charter ES WSM P1GMP1Erickson-Hall (LLB)(CZ21-0777-24.A1 _Recording.mp4
  
2/7/2025 3:27 PMCruz Maria
2024-02-28 PJM Albert Einstein Charter ES WSM P1GMP1Erickson-Hall (LLB)(CZ21-0777-24.A1- Attendee Report.pdf
  
2/7/2025 3:26 PMCruz Maria
2024-02-29 PJM 4_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat.txt
  
2/29/2024 12:32 PMCruz Maria
2024-02-29 PJM 4_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
2/29/2024 4:11 PMCruz Maria
collapse Document Types : Bid Documents ‎(3)
Bid Ad for GMP-1_Albert Einstein AC ES Phs-1 WSM (Daily Transcript).pdf
  
7/29/2022 3:27 PMCruz Maria
Erickson-Hall List of Subcontractors.pdf
  
7/29/2022 3:39 PMCruz Maria
GC LOA_Erickson-Hall.pdf
  
7/29/2022 3:38 PMCruz Maria
collapse Document Types : Letter of Assent & Sub pre-job Forms ‎(74)
_Erickson-Hall (GC) PJC Form.pdf
  
1/11/2024 10:04 AMCruz Maria
A1 Fire  LOA - SPJ.pdf
  
1/10/2024 2:10 PMCruz Maria
Abdellatif LOA - SPJ.pdf
  
2/26/2024 12:40 PMCruz Maria
ACH Mechanical  LOA - SPJ (rev).pdf
Checked Out To: Cruz MariaACH Mechanical  LOA - SPJ (rev).pdf
Checked Out To: Cruz Maria
  
1/10/2024 2:11 PMCruz Maria
ACH Mechanical  LOA - SPJ (rev2).pdf
  
1/10/2024 2:19 PMCruz Maria
ACH Mechanical  LOA - SPJ.pdf
  
11/13/2023 6:55 AMCruz Maria
ACH tier Imperial Specialty LOA - SPJ.pdf
  
2/27/2024 5:53 PMCruz Maria
ACH tier Matrix Air Balancing LOA - SPJ.pdf
  
2/26/2024 12:51 PMCruz Maria
ACH tier Matrix Air LOA.pdf
  
1/10/2024 2:15 PMCruz Maria
ACH tier Matrix Air SPJ (rev1).pdf
  
1/10/2024 2:26 PMCruz Maria
Bayview Envir tier Bayview Demolition LOA and SPJ.pdf
  
11/13/2023 7:54 AMCruz Maria
Bayview Environmental LOA and SPJ (revision2).pdf
  
11/13/2023 7:55 AMCruz Maria
Bayview Environmental LOA and SPJ.pdf
  
11/13/2023 7:55 AMCruz Maria
CalCom Insulation  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
Caston LOA - SPJ.pdf
  
4/5/2023 3:02 PMCruz Maria
Caston SPJ (rev).pdf
  
4/19/2023 10:18 AMCruz Maria
Cats Excavating LOA and SPJ.pdf
  
11/13/2023 7:55 AMCruz Maria
CATS tier Graham Cracker Demo LOA - SPJ.pdf
  
7/26/2023 2:53 PMCruz Maria
Centex Glazing LOA - SPJ.pdf
  
5/11/2023 7:44 AMCruz Maria
Coastal Caulking LOA - SPJ.pdf
  
2/26/2024 12:55 PMCruz Maria
Construction Hardware  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
Construction Hardware tier JLM Installation  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
Continental Marble and Tile Company LOA - SPJ.pdf
  
2/27/2024 5:59 PMCruz Maria
D3 Construction -LOA and SPJ.pdf
  
7/29/2022 4:01 PMCruz Maria
Diversified Window Coverings  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
DLG Contractors LOA - SPJ.pdf
  
2/28/2024 1:07 PMCruz Maria
Econo Fence LOA - SPJ.pdf
  
2/26/2024 1:05 PMCruz Maria
ERES  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
Erosion Control Experts LOA and SPJ (revision).pdf
  
11/13/2023 7:56 AMCruz Maria
H2I Grp LOA (not signed) - SPJ ((NP)).pdf
  
2/28/2024 12:08 PMCruz Maria
H2I tier Haldeman Homme Inc LOA - SPJ.pdf
  
2/28/2024 11:22 AMCruz Maria
Hamel Concrete LOA and SPJ (revised).pdf
  
11/13/2023 7:56 AMCruz Maria
Hamel Concrete LOA and SPJ.pdf
  
11/13/2023 7:57 AMCruz Maria
Hamel tier Quality Rebar LOA and SPJ (revision).pdf
  
11/13/2023 7:57 AMCruz Maria
Hamel tier Quality Rebar LOA and SPJ.pdf
  
11/13/2023 7:57 AMCruz Maria
K-Z Cabinet  LOA - SPJ.pdf
  
1/10/2024 2:12 PMCruz Maria
MEK LOA and SPJ (revised).pdf
  
11/13/2023 7:58 AMCruz Maria
MEK LOA and SPJ.pdf
  
11/13/2023 7:58 AMCruz Maria
Neal Electric LOA and SPJ (rev).pdf
  
11/13/2023 7:52 AMCruz Maria
Neal Electric LOA and SPJ (revised).pdf
  
11/13/2023 7:58 AMCruz Maria
Neal Electric LOA and SPJ.pdf
  
11/13/2023 7:59 AMCruz Maria
Neal Electric tier AEC LOA - SPJ.pdf
  
11/16/2023 11:07 PMCruz Maria
Neal Electric tier Applied Engr Concepts  LOA - SPJ.pdf
  
1/10/2024 2:12 PMCruz Maria
Neal Electric tier Penhall LOA -SPJ.pdf
  
11/16/2023 11:00 PMCruz Maria
Neal Electric tier Standard Elec. LOA - SPJ.pdf
  
11/16/2023 10:59 PMCruz Maria
Neal Electric tier West Coast Firestopping LOA and SPJ.pdf
  
1/11/2024 10:08 AMCruz Maria
Neal Electric tier World Bridge LOA and SPJ.pdf
  
1/11/2024 10:08 AMCruz Maria
NXTGEN Signs LOA (need rev) - SPJ.pdf
  
2/27/2024 6:02 PMCruz Maria
NXTGEN Signs LOA (signed) - SPJ.pdf
  
2/28/2024 9:12 AMCruz Maria
Pacific Coast Iron LOA - SPJ.pdf
  
11/16/2023 10:58 PMCruz Maria
Pacific Coast tier Asbury 2nd tier Bragg Crane LOA - SPJ (Signatory-12).pdf
  
11/16/2023 11:23 PMCruz Maria
Pacific Coast tier Asbury Steel  LOA - SPJ (rev).pdf
  
1/10/2024 2:12 PMCruz Maria
Pacific Coast tier Asbury Steel  LOA - SPJ.pdf
  
11/13/2023 7:04 AMCruz Maria
Pacific Coast tier JD2  LOA - SPJ (rev).pdf
  
1/10/2024 2:12 PMCruz Maria
Pacific Coast tier JD2  LOA - SPJ.pdf
  
11/13/2023 7:04 AMCruz Maria
Pennsylvania  LOA - SPJ.pdf
  
1/10/2024 2:12 PMCruz Maria
PGC LOA - SPJ (rev).pdf
  
5/10/2023 12:20 PMCruz Maria
PGC LOA - SPJ.pdf
  
4/13/2023 12:16 PMCruz Maria
Pierre Landscape LOA and SPJ.pdf
  
11/13/2023 7:59 AMCruz Maria
Preferred Ceilings  LOA - SPJ.pdf
  
11/13/2023 4:57 PMCruz Maria
Progressive Surface Solutions  LOA - SPJ (rev).pdf
  
1/10/2024 2:12 PMCruz Maria
Progressive Surface Solutions  LOA - SPJ.pdf
  
11/13/2023 7:08 AMCruz Maria
Ranbar Plumbing LOA - SPJ (rev -tier list).pdf
  
2/29/2024 9:28 AMCruz Maria
Ranbar Plumbing LOA and SPJ (revised).pdf
  
11/13/2023 7:59 AMCruz Maria
Ranbar Plumbing LOA and SPJ.pdf
  
11/13/2023 7:59 AMCruz Maria
Ranbar tier Bonita Pipeline LOA and SPJ.pdf
  
1/11/2024 10:12 AMCruz Maria
Ranbar tier Solid Structures LOA - SPJ.pdf
  
1/10/2024 2:13 PMCruz Maria
RAP Engineering LOA - SPJ.pdf
  
2/26/2024 1:07 PMCruz Maria
StormwaterPros LOA and SPJ.pdf
  
11/13/2023 7:59 AMCruz Maria
Superior Doors LOA - SPJ.pdf
  
2/28/2024 12:58 PMCruz Maria
Sylvester Roofing LOA - SPJ.pdf
  
4/28/2023 12:18 PMCruz Maria
TL Shileds LOA - SPJ.pdf
  
2/26/2024 1:09 PMCruz Maria
XYZ Consulating LOA and SPJ (revision).pdf
  
11/13/2023 8:00 AMCruz Maria
XYZ Consulating LOA and SPJ.pdf
  
11/13/2023 8:00 AMCruz Maria