Skip Ribbon Commands
Skip to main content

Canyon Hills HS

:

(GMP No. 1) CC22-0228-42.A2

Canyon Hills High School Career Technical Education – Engineering Technology Lab
  
  CTE Eng. Tech Lab GMP 1                                           PSA Specialist:
   PWCR#: 418651​                                               Edmundo "Ed" Avila II
                                                                                  eavilaii@sandi.net   Cell: 619.885.5614  
                                                                                  eavilaii@sandi.net   Cell: 619.885.5614  

                                                                                  Bid Advertisement Date:  02/22/22​
  
  
  
  
collapse Document Types :  ‎(2)
Folder: Second Session Pre-Job Conference 9-29-22
  
9/16/2022 7:45 AMAvila II Edmundo
Folder: Third Session Pre-Job Conference 10-27-22
  
10/20/2022 3:54 PMAvila II Edmundo
collapse Document Types : Bid Documents ‎(2)
FINAL Ad-Canyon Hills HS GMP 1,2,3.pdf
  
6/9/2022 10:16 AMAvila II Edmundo
Final Results CHHS CC22-0228-42.A2.pdf
  
6/9/2022 10:11 AMAvila II Edmundo
collapse Document Types : General Contractor Pre-Job Form ‎(1)
SUNDT GMP 1 Prejob Conference.pdf
  
6/30/2022 3:01 PMAvila II Edmundo
collapse Document Types : LOA and Subcontractor Pre-Job Form ‎(17)
ACH Mechanical GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:04 PMAvila II Edmundo
Bayview Environmental GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:08 PMAvila II Edmundo
Bayview Environmental REVISED GMP 1 LOA and Pre-Job.pdf
  
7/7/2022 12:44 PMAvila II Edmundo
Brady SoCal GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:09 PMAvila II Edmundo
Cable Pipe Leak Detection tier to D3 GMP 1 LOA and Pre-Job.pdf
  
7/6/2022 4:57 PMAvila II Edmundo
D3 Construction GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:10 PMAvila II Edmundo
Johnson Finch McClure GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:12 PMAvila II Edmundo
Long Glazing GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:13 PMAvila II Edmundo
MEK GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 4:40 PMAvila II Edmundo
Neal Electric GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:15 PMAvila II Edmundo
SD Paint Pros GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:16 PMAvila II Edmundo
SD Paint Pros GMP 1 REVISED LOA and Pre-Job.pdf
  
7/7/2022 12:45 PMAvila II Edmundo
SD Sheet Metal GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:17 PMAvila II Edmundo
Standard Drywall GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:20 PMAvila II Edmundo
Standard Drywall REVISED GMP 1 LOA and Pre-Job.pdf
  
7/12/2022 12:52 PMAvila II Edmundo
Standard Electronics GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:24 PMAvila II Edmundo
World Bridge GMP 1 LOA and Pre-Job.pdf
  
6/30/2022 3:25 PMAvila II Edmundo
collapse Document Types : Pre-Job Conference Logs ‎(3)
Canyon Hills 7-6-22 pre-job Attendee Report.csv
  
7/6/2022 12:10 PMAvila II Edmundo
Canyon Hills 7-6-22 pre-job meeting_saved_chat.txt
  
7/6/2022 12:11 PMAvila II Edmundo
Canyon Hills 7-6-22 pre-job video recording.txt
  
7/6/2022 12:11 PMAvila II Edmundo