Skip Ribbon Commands
Skip to main content

G.W. Smith Ed Center

:

GMP 3 Site Redevelopment CC23‐0127‐42‐A5‐G4 :Document TypesUse SHIFT+ENTER to open the menu (new window).Open MenuOpen Menu

1. Contract Number: CC23‐0127‐42‐A5‐G4 (GMP No. 3)
2. Project Name: G.W. Smith Education Center Site Redevelopment (LLB)
3. Project Estimate: is between $136,000,000 and $140,000,000
4. Schedule: The anticipated schedule is January 15, 2025 to January 21, 2027
5. Project Description: Construction of the office building addition, renovation/remodel of the existing office building and construction of surface site improvements, surface parking and Pedestrian pavement/walkways, irrigation systems and landscaping. Phase III includes a second building permit and completes the work permitted in the public improvement.
  
  
  
  
collapse Document Types : Bid Documents ‎(2)
Ad for Construction CC23-0127-42-A5-G4 G.W. Ed Center Site Redevelopment LLB.pdf
  
1/2/2025 3:21 PMAvila II Edmundo
PSA LOA_Ed Center GMP 3.pdf
  
1/30/2025 2:01 PMAvila II Edmundo
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(41)
American Iron Engineering LOA.pdf
  
1/9/2025 2:57 PMAvila II Edmundo
American Iron Engineering tier to MDB Pre-Job Form.pdf
  
1/16/2025 11:45 AMAvila II Edmundo
Asbury Steel LOA.pdf
  
1/22/2025 1:11 PMAvila II Edmundo
ASE Contracting tier to Cement Cutting Pre-Job Form.pdf
  
1/15/2025 8:08 AMAvila II Edmundo
Baker Electric LOA.pdf
  
1/3/2025 11:58 AMAvila II Edmundo
Baker Electric Pre-Job Form.pdf
  
1/22/2025 2:30 PMAvila II Edmundo
Brady West LOA.pdf
  
1/16/2025 7:58 AMAvila II Edmundo
Brady West Pre-Job Form.pdf
  
1/21/2025 7:56 AMAvila II Edmundo
BWE LOA.pdf
  
1/3/2025 11:59 AMAvila II Edmundo
BWE Pre-Job Form.pdf
  
1/6/2025 12:16 PMAvila II Edmundo
C.W. Driver Pre-Job Form.pdf
  
1/30/2025 2:00 PMAvila II Edmundo
Cement Cutting Inc LOA.pdf
  
1/3/2025 12:01 PMAvila II Edmundo
Cement Cutting Inc Pre-Job Form.pdf
  
1/21/2025 3:24 PMAvila II Edmundo
Commercial Scaffolding of California LOA.pdf
  
1/16/2025 11:34 AMAvila II Edmundo
Commercial Scaffolding tier to Brady West Pre-Job Form.pdf
  
1/21/2025 7:57 AMAvila II Edmundo
Control Air Enterprises LOA.pdf
  
1/7/2025 9:22 AMAvila II Edmundo
Control Air Enterprises Pre-Job Form.pdf
  
1/7/2025 11:19 AMAvila II Edmundo
Core Contracting LOA.pdf
  
1/2/2025 3:30 PMAvila II Edmundo
Core Contracting Pre-Job Form.pdf
  
1/6/2025 12:58 PMAvila II Edmundo
Cosco Fire Protection LOA.pdf
  
1/6/2025 1:02 PMAvila II Edmundo
Cosco Fire Protection Pre-Job Form.pdf
  
1/6/2025 12:48 PMAvila II Edmundo
CR Insulation LOA.pdf
  
1/16/2025 3:50 PMAvila II Edmundo
CR Insulation tier to Brady West Pre-Job Form.pdf
  
1/17/2025 1:35 PMAvila II Edmundo
Life Deck Coating Installations LOA.pdf
  
1/23/2025 1:37 PMAvila II Edmundo
MDB General Engineering LOA.pdf
  
1/3/2025 12:00 PMAvila II Edmundo
MDB General Engineering Pre-Job Form.pdf
  
1/3/2025 11:44 AMAvila II Edmundo
MEK Enterprises LOA.pdf
  
1/15/2025 8:27 AMAvila II Edmundo
MEK Enterprises Pre-Job Form.pdf
  
1/17/2025 1:32 PMAvila II Edmundo
Nationwide Shotcrete LOA.pdf
  
1/22/2025 2:55 PMAvila II Edmundo
Nationwide Shotcrete tier to Pacific Southwest Structures Pre-Job Form.pdf
  
1/22/2025 3:10 PMAvila II Edmundo
NP Electric LOA.pdf
  
1/10/2025 8:13 AMAvila II Edmundo
NP Electric tier to Control Air Pre-Job Form.pdf
  
1/15/2025 9:42 AMAvila II Edmundo
Pacific Coast Iron LOA.pdf
  
1/2/2025 3:30 PMAvila II Edmundo
Pacific Southwest Structures LOA.pdf
  
1/21/2025 4:36 PMAvila II Edmundo
Pacific Southwest Structures Pre-Job Form.pdf
  
1/21/2025 3:40 PMAvila II Edmundo
Pacific Steel Group tier to Pacific Southwest Structures Pre-Job Form.pdf
  
1/22/2025 3:06 PMAvila II Edmundo
Pullman SST LOA.pdf
  
1/22/2025 2:28 PMAvila II Edmundo
Summit Erosion Control LOA.pdf
  
1/2/2025 3:32 PMAvila II Edmundo
Summit Erosion Control Pre-Job Form.pdf
  
1/15/2025 9:39 AMAvila II Edmundo
Superior Door LOA.pdf
  
1/21/2025 4:40 PMAvila II Edmundo
Superior Door tier to Brady West Pre-Job Form.pdf
  
1/22/2025 3:03 PMAvila II Edmundo
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(4)
20250123 PJCM Session 03 GW Smith Education Ctr Site Redevelopment LLB CC23‐0127‐42‐A5‐G4 (Chat).pdf
  
2/4/2025 2:18 PMWalden Loretta
20250123 PJCM Session 03 GW Smith Education Ctr Site Redevelopment LLB CC23‐0127‐42‐A5‐G4 (Recording).mp4
  
2/4/2025 2:02 PMWalden Loretta
20250123 PJCM Session 03 GW Smith Education Ctr Site Redevelopment LLB CC23‐0127‐42‐A5‐G4 (Transcript).pdf
  
2/4/2025 2:18 PMWalden Loretta
20250123 PJCM Session 03 GW Smith Education CtrSite Redevelopment (LLB)  CC23‐0127‐42‐A5‐G4 (Attendance).pdf
  
2/4/2025 2:17 PMWalden Loretta