Skip Ribbon Commands
Skip to main content

Garfield HS

:

Garfield HS Airhanler Chiller Replacement CC24-0935-50

Removal and replacement of existing HVAC system including chiller, air distribution and piping. Support work includes electrical disconnects and new connections and structural and roofing repair/upgrades as required for removal and installation of HVAC equipment.
​​   Garfield HS                                                           PSA Specialist:
   1255 16th Street, San Diego, CA 92101                    Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        03/05/24
        04/30/25                                                                           Bid award:   05/14/24
    ***Anticipated start Summer 2025***                                                                                             
                                                                                                ​Project value: $5,467,000

  
  
  
  
collapse Document Types : Bid Documents ‎(4)
01. Ad for Bids Garfield HS Air Handler Chiller Replacement CC24-0935-50-00-00.pdf
  
6/3/2024 5:01 PMCruz Maria
01.a Bid Documents.pdf
  
6/3/2024 5:19 PMCruz Maria
02. Final Bid Tab Garfield HS Air Handler Chiller Replacement CC24-0935-50-00-00.pdf
  
6/3/2024 5:01 PMCruz Maria
03. Sub list Garfield HS Air Handler Chiller Replacement CC24-0935-50-00-00.pdf
  
6/3/2024 5:08 PMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(16)
_GC Conan LOA.pdf
  
6/3/2024 5:08 PMCruz Maria
Able Heating and Air Conditioning LOA.pdf
  
5/1/2025 8:42 AMCruz Maria
Able Heating tier Air Balance LOA.pdf
  
5/1/2025 8:42 AMCruz Maria
Able Heating tier Control Air Enterprises LOA.pdf
  
5/1/2025 8:59 AMCruz Maria
Able Heating tier Control Air Enterprises PJF (230).pdf
  
5/1/2025 8:59 AMCruz Maria
Able Heating tier Control Air tier NP Electric LOA.pdf
  
5/1/2025 8:44 AMCruz Maria
Able Heating tier Control Air tier NP Electric PJF (569).pdf
  
5/1/2025 9:00 AMCruz Maria
Dave Whipple Sheet Metal PJF (230).pdf
  
5/1/2025 9:02 AMCruz Maria
JDS Plumbing LOA.pdf
  
5/1/2025 9:02 AMCruz Maria
JDS Plumbing PJF (89, 230).pdf
  
5/1/2025 9:03 AMCruz Maria
Johnson Controls Fire Protection LOA.pdf
  
5/1/2025 9:03 AMCruz Maria
Robinson Electric LOA.pdf
  
5/1/2025 9:05 AMCruz Maria
Robinson Electric PJF (569).pdf
  
5/1/2025 9:06 AMCruz Maria
Roof Construction (Chambers) LOA.pdf
  
5/1/2025 9:06 AMCruz Maria
Roof Construction (Chambers) PJF (12, 45).pdf
  
5/1/2025 9:09 AMCruz Maria
World Bridge Technologies LOA.pdf
  
5/1/2025 9:09 AMCruz Maria
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(4)
202050430PJCM Session 01 Garfield HS Air Handler Chiller Replacement-- CC24-0935-50-00-00, Conan Construction -Recording.mp4
  
5/1/2025 11:18 AMWalden Loretta
202050430PJCM Session 01 Garfield HS Air Handler Chiller Replacement--CC24-0935-50-00-00, Conan Construction - Attendance.pdf
  
5/1/2025 11:21 AMWalden Loretta
202050430PJCM Session 01 Garfield HS Air Handler Chiller Replacement--CC24-0935-50-00-00, Conan Construction-Chat.pdf
  
5/1/2025 11:21 AMWalden Loretta
20250430PJCM Session 01 Garfield HS Air Handler Chiller Replacement-CC24-0935-50-00-00, Conan Construction-Transcript.pdf
  
5/1/2025 11:21 AMWalden Loretta