You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Site Actions
This page location is:
PSA
Chesterton ES
All Site Content
Sign In
Chesterton ES
All Site Content
Displays all sites, lists, and libraries in this site.
Quick Launch
Project Content
Currently selected
Library
Chesterton ES Whole Site Rebuild, CC25-0309-52-00-00
All Site Content
View:
Document Libraries
Items
Last Modified
Document Libraries
Chesterton ES Whole Site Rebuild, CC25-0309-52-00-00
The whole site rebuild consists of the demolition of all permanent buildings and portable classrooms and the construction of 5 new buildings; a new admin building, a multi-purpose/food service building, and 3 new classroom buildings. Site work consists of removal of all existing play structures, landscaping, flatwork, wet and dry utilities, and the installation of new landscaping, wet and dry utilities, flatwork, and play structures. The sitework includes new parking and drop-off areas, trash enclosures, and fencing.
1
2 months ago
Library
0
2 months ago
Site Assets
Use this library to store files which are included on pages within this site, such as images on Wiki pages.
3
2 months ago
Site Pages
Use this library to create and store pages on this site.
2
2 months ago