Skip Ribbon Commands
Skip to main content

Grant K-8

:

Grant UTK-8 School WSM PHASE II LLB -Interim Housing LB25-0910-23-00-G1 :Document TypesUse SHIFT+ENTER to open the menu (new window).Open MenuOpen Menu

GMP #1 scope consists of the following components:
1) Construction of (11) portable buildings and minor alterations to (10) existing portable classroom buildings, which include (1) Workroom, (1) Nurse building, (1) Music classroom building, (1) Food Service building, (2) restroom buildings and (4) classroom buildings. Construction of new pre-manufacturer ramps for the new buildings.
2) Minor alterations to (10) existing portable classroom buildings and (1) existing portable classroom building.
3) Site improvements including accessibility upgrades, and construction of a new pre-manufactured metal ramp to connect the lower and upper site.
4) Construction of new pre-manufactured lunch shelters.
  
  
  
  
collapse Document Types : Bid Documents ‎(2)
Ad for Construction LB25-0910-23 Grant UTK-8 WSM.pdf
  
2/12/2025 1:00 PMCruz Maria
RFP_Grant K-8 WSM Phase II.pdf
  
2/12/2025 1:01 PMCruz Maria