Skip Ribbon Commands
Skip to main content

Grant K-8

:

Grant UTK-8 School WSM PHASE II LLB -Interim Housing LB25-0910-23-00-G1 :Document TypesUse SHIFT+ENTER to open the menu (new window).Open MenuOpen Menu

GMP #1 scope consists of the following components:
1) Construction of (11) portable buildings and minor alterations to (10) existing portable classroom buildings, which include (1) Workroom, (1) Nurse building, (1) Music classroom building, (1) Food Service building, (2) restroom buildings and (4) classroom buildings. Construction of new pre-manufacturer ramps for the new buildings.
2) Minor alterations to (10) existing portable classroom buildings and (1) existing portable classroom building.
3) Site improvements including accessibility upgrades, and construction of a new pre-manufactured metal ramp to connect the lower and upper site.
4) Construction of new pre-manufactured lunch shelters.
  
  
  
  
collapse Document Types : Bid Documents ‎(3)
20025-05-14_Final Results_Grant UTK-8 WSM Interim Housing (LB25-0910-23-00-G1).pdf
  
5/15/2025 4:45 PMCruz Maria
Ad for Construction LB25-0910-23 Grant UTK-8 WSM.pdf
  
2/12/2025 1:00 PMCruz Maria
RFP_Grant K-8 WSM Phase II.pdf
  
2/12/2025 1:01 PMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(42)
_GC_Sundt LOA.pdf
  
6/10/2025 6:28 PMCruz Maria
_GC_Sundt PJF (NSP).pdf
  
6/10/2025 6:29 PMCruz Maria
Brady West LOA.pdf
  
7/8/2025 5:18 PMCruz Maria
Brady West PJF (619).pdf
  
6/10/2025 6:29 PMCruz Maria
Crown Fence LOA.pdf
  
7/8/2025 5:17 PMCruz Maria
Crown Fence PJF (12, 89).pdf
  
7/8/2025 5:20 PMCruz Maria
D 3 Construction LOA.pdf
  
6/10/2025 6:29 PMCruz Maria
D 3 Construction PJF (89).pdf
  
6/10/2025 6:30 PMCruz Maria
E.L. Hobbs LOA.pdf
  
7/8/2025 5:20 PMCruz Maria
E.L. Hobbs PJF (619, 1414).pdf
  
7/8/2025 5:21 PMCruz Maria
F.J. Willert LOA.pdf
  
6/10/2025 6:30 PMCruz Maria
F.J. Willert PJF (12, 89, 166).pdf
  
6/10/2025 6:30 PMCruz Maria
F.J. Willert TIER Cable, Pipe and Leak LOA.pdf
  
7/8/2025 5:23 PMCruz Maria
F.J. Willert TIER Cable, Pipe and Leak PJF (89).pdf
  
7/8/2025 5:29 PMCruz Maria
MB Pavement Services LOA.pdf
  
6/10/2025 7:11 PMCruz Maria
MB Pavement Services PJF (1184).pdf
  
7/8/2025 5:35 PMCruz Maria
Merino Landscape LOA.pdf
  
7/8/2025 6:00 PMCruz Maria
Merino Landscape PJF (12, 89).pdf
  
7/8/2025 5:55 PMCruz Maria
National Electric Works PJF (569).pdf
  
7/8/2025 5:48 PMCruz Maria
National Electric Works tier JDS Plumbing LOA.pdf
  
7/8/2025 6:07 PMCruz Maria
National Electric Works tier JDS Plumbing PJF (12, 89).pdf
  
7/8/2025 6:13 PMCruz Maria
National Electric Works tier Standard Electronics LOA.pdf
  
7/8/2025 6:13 PMCruz Maria
National Electric Works tier Standard Electronics PJF (569).pdf
  
7/8/2025 6:18 PMCruz Maria
Phoenix Corps LOA.pdf
  
7/8/2025 6:38 PMCruz Maria
Ranbar Plumbing LOA.pdf
  
7/8/2025 6:20 PMCruz Maria
Ranbar Plumbing PJF (12, 89, 230)(rev- add assignments).pdf
  
7/8/2025 6:20 PMCruz Maria
RAP Engineering LOA.pdf
  
6/10/2025 6:30 PMCruz Maria
RAP Engineering PJF (12, 89).pdf
  
6/10/2025 6:31 PMCruz Maria
Sign Pro dba Baja Signs Group LOA.pdf
  
7/8/2025 6:20 PMCruz Maria
Sign Pro dba Baja Signs Group PJF (619).pdf
  
7/8/2025 6:21 PMCruz Maria
Stormwater Pros LOA.pdf
  
6/10/2025 7:09 PMCruz Maria
Summit Erosion Control LOA.pdf
  
6/10/2025 6:31 PMCruz Maria
Summit Erosion Control PJF (12, 89, 166).pdf
  
6/10/2025 6:31 PMCruz Maria
Team C Construction LOA.pdf
  
7/8/2025 6:38 PMCruz Maria
Team C Construction PJF (12, 89, 500, 619).pdf
  
7/8/2025 6:44 PMCruz Maria
The Office - Furniture Solutions LOA.pdf
  
6/10/2025 6:32 PMCruz Maria
The Office - Furniture Solutions PJF (89).pdf
  
7/8/2025 6:44 PMCruz Maria
Willscot LOA.pdf
  
6/10/2025 6:32 PMCruz Maria
World Bridge Tech LOA.pdf
  
6/10/2025 6:32 PMCruz Maria
World Bridge Tech PJF (569).pdf
  
7/8/2025 6:45 PMCruz Maria
XYZ Consulting LOA.pdf
  
7/8/2025 6:46 PMCruz Maria
XYZ Consulting PJF (12).pdf
  
7/8/2025 6:46 PMCruz Maria
collapse Document Types : Pre-Job Conf. (PJC) Meetings ‎(4)
20250612 PJCM Session 01 Grant UTK-8 School WSM PH II LLB -Interim Housing, LB25-0910-23-00-G1, Sundt -Chat.pdf
  
6/13/2025 2:16 PMWalden Loretta
20250612 PJCM Session 01 Grant UTK-8 School WSM PH II LLB -Interim Housing, LB25-0910-23-00-G1, Sundt -Recording- Attendance.pdf
  
6/13/2025 2:16 PMWalden Loretta
20250612 PJCM Session 01 Grant UTK-8 School WSM PH II LLB -Interim Housing, LB25-0910-23-00-G1, Sundt -Recording.mp4
  
6/13/2025 2:14 PMWalden Loretta
20250612 PJCM Session 01 Grant UTK-8 School WSM PH II LLB -Interim Housing, LB25-0910-23-00-G1, Sundt -Transcript.pdf
  
6/13/2025 2:16 PMWalden Loretta