You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
Site Actions
This page location is:
PSA
King Chavez
All Site Content
Sign In
King Chavez
All Site Content
Displays all sites, lists, and libraries in this site.
Home
Currently selected
PSA Home
Quick Launch
Project Content
Currently selected
Library
King Chavez WSM JUF LLB CZ20-0136-42
King Chavez JUF Improvements CZ20-0136-42.A2
King Chavez Academy of Excellence WSM LLB CC22-0902-08
King Chavez Academy of Excellence WSM (LLB) (GMP 1) CC22-0902-08-A1-G1
All Site Content
View:
Document Libraries
Items
Last Modified
Document Libraries
King Chavez Academy of Excellence WSM (LLB) (GMP 1) CC22-0902-08-A1-G1
Demolition of all existing buildings, two (2) existing portable Kindergarten classroom buildings and all existing sitework; removal of all other portable buildings; construction of two (2) two-story classroom buildings, one (1) single-story administration building and one (1) single-story modular food service building; installation of hardscape, landscape and an artificial turf soccer field, playground areas with play structures, one (1) fabric shade structure and one (1) PC-approved lunch shade structure.
163
5 days ago
King Chavez Academy of Excellence WSM LLB CC22-0902-08
This project site is located on an existing 1.65-acre triangular shaped campus consisting of one permanent building and several portable classroom buildings. The site is relatively flat with the greatest grade difference being seven feet from the north corner to the southwest corner. The surrounding area consists of single-family residential neighborhood bordered by interstate-5 on the southwest side. The King Chavez Academy of Excellence site is a SDUSD-owned facility occupied by a charter under King Chavez Neighborhood of Schools focusing on bi-literacy and the arts.
The whole site modernization project will replace all portable classrooms and existing administration building with two new 2-story classroom buildings, an administration building, food service modular building and a lunch shelter. This project also involves site improvements that will replace all existing hardscape and landscape areas. The project scope includes limited off-site improvements and no new curb-cuts or street parking modifications are planned in the design.
Construction shall be completed in 3 phases to allow the school to remain operational onsite throughout construction. Phase 1 includes construction of new 2-story classroom Building 300 on the southwest side of the site where existing play structure, hard-courts and lunch shelter currently exist, leaving some play areas intact for students during this phase. Once Phase 1 is complete and operations can be transitioned into the new Building 300, Phase 2 will demolish the existing administration building and several portable classrooms to allow construction of the connected 2-story classroom Building 200 and administration Building 100. Construction of the new food service modular building and lunch shelter will also be incorporated into Phase 2. Lastly, phase 3 will demolish all remaining existing portable buildings on campus and complete the site work including hardcourts, play structures, turf and garden areas, and futsal/soccer pitch.
4
2 years ago
King Chavez JUF Improvements CZ20-0136-42.A2
16
3 years ago
King Chavez WSM JUF LLB CZ20-0136-42
88
3 years ago
Library
0
5 years ago
Site Assets
Use this library to store files which are included on pages within this site, such as images on Wiki pages.
4
16 months ago
Site Pages
Use this library to create and store pages on this site.
2
16 months ago